ACT · Service line two · Electrical
Active & Power Maintenance
What we do
The work, in detail.
- Rectifier installation, replacement and load balancing
- Battery bank inspection and capacity testing (IEEE 1188)
- Generator service, refuelling and load-bank testing
- AC distribution and changeover-switch maintenance
- DC plant fault-finding and rectification
- Earthing and bonding verification
- BMS (battery monitoring system) configuration
- Fuel polishing and contamination management
Where this lives on a site
At the diesel genset and inside the BTS shelter — battery cabinets, rectifiers, AC and DC plant. The systems that keep the radio gear above running 24 hours a day, every day.
Standards & compliance
- SANS 10142-1 (electrical wiring)
- IEEE 1188 (VRLA battery maintenance)
- IEC 62040 (UPS systems)
- SANS 10089 (fuel storage)
- Operator-specific MSWs
From the company profile
- AC / DC systems, rectifiers, battery banks
- Generator maintenance, refuelling & rentals
- Earthing, bonding & lightning protection
Glenshade Business Profile, page 5
How we deliver
Where this fits in your operation.
Every Glenshade engagement runs the same five-step shape. The same crew that walked the site can hand the as-builts back to your NOC the next morning.
- Step 01
Operator or TowerCo site
Vodacom, ATC, Insite or MAST asset on the National Roaming footprint.
- Step 02
RAMS + method statement
Risk and method pack signed off before any boots reach the gate.
- Step 03
Glenshade crew dispatched
Branded fleet, trackered, marshalled from one of three regional bases.
- Step 04
On-site work — Active & Power Maintenance
Active & Power Maintenance happens at this stage — every other step exists to make this clean.
- Step 05
Photographic as-built pack
Geotagged before-and-after, signed checklist, e-mailed within the SLA window.
On site
What this looks like in the field.




Other services
The full delivery posture.
We're built so that the same crew that walked the tower can hand over to the same crew that does the civils — without a second site visit, a second method statement, or a second invoice cycle.
Next step
Tell us about the scope.
Send us the site list and the standard you work to. We'll come back with a RAMS pack and a quote.
