Skip to main content
Glenshade Holdings
Client portal

ACT · Service line two · Electrical

Active & Power Maintenance

Maintenance of the live electrical and power systems that keep base stations on air — rectifiers, battery banks, generators, AC distribution, DC plant fault-finding. Routine cycles plus 24/7 emergency response.

What we do

The work, in detail.

  • Rectifier installation, replacement and load balancing
  • Battery bank inspection and capacity testing (IEEE 1188)
  • Generator service, refuelling and load-bank testing
  • AC distribution and changeover-switch maintenance
  • DC plant fault-finding and rectification
  • Earthing and bonding verification
  • BMS (battery monitoring system) configuration
  • Fuel polishing and contamination management

Where this lives on a site

At the diesel genset and inside the BTS shelter — battery cabinets, rectifiers, AC and DC plant. The systems that keep the radio gear above running 24 hours a day, every day.

Standards & compliance

  • SANS 10142-1 (electrical wiring)
  • IEEE 1188 (VRLA battery maintenance)
  • IEC 62040 (UPS systems)
  • SANS 10089 (fuel storage)
  • Operator-specific MSWs

From the company profile

  • AC / DC systems, rectifiers, battery banks
  • Generator maintenance, refuelling & rentals
  • Earthing, bonding & lightning protection

Glenshade Business Profile, page 5

How we deliver

Where this fits in your operation.

Every Glenshade engagement runs the same five-step shape. The same crew that walked the site can hand the as-builts back to your NOC the next morning.

  1. Step 01

    Operator or TowerCo site

    Vodacom, ATC, Insite or MAST asset on the National Roaming footprint.

  2. Step 02

    RAMS + method statement

    Risk and method pack signed off before any boots reach the gate.

  3. Step 03

    Glenshade crew dispatched

    Branded fleet, trackered, marshalled from one of three regional bases.

  4. Step 04

    On-site work — Active & Power Maintenance

    Active & Power Maintenance happens at this stage — every other step exists to make this clean.

  5. Step 05

    Photographic as-built pack

    Geotagged before-and-after, signed checklist, e-mailed within the SLA window.

On site

What this looks like in the field.

Active & Power Maintenance — site work
Active & Power Maintenance — site work
Active & Power Maintenance — site work
Active & Power Maintenance — site work

Other services

The full delivery posture.

We're built so that the same crew that walked the tower can hand over to the same crew that does the civils — without a second site visit, a second method statement, or a second invoice cycle.

Next step

Tell us about the scope.

Send us the site list and the standard you work to. We'll come back with a RAMS pack and a quote.