Skip to main content
Glenshade Holdings
Client portal

GEN · Service line six · Power continuity

Generator Services

Dedicated diesel-generator support — scheduled servicing on a fixed cadence, refuelling chain-of-custody, load-bank testing, fuel-quality management, and 24/7 emergency callout. When grid power drops, the genset is the only thing keeping the base station on air; we keep it ready.

What we do

The work, in detail.

  • Scheduled diesel-generator service — oil, filters, coolant, belts, hoses
  • Refuelling on a fixed cadence or against hour-meter milestones
  • Load-bank testing — quarterly or per operator MSW (IEEE / NFPA 110)
  • Fuel-quality testing — water content, microbial contamination, particulates
  • Fuel polishing — recirculation through fine filtration
  • ATS changeover-panel verification — mains-to-genset transfer time
  • Run-hour logging and annual full-service certification
  • Emergency callout when a site is on genset and grid restoration is delayed

Where this lives on a site

At the diesel genset on the right side of the compound — usually an enclosed canopy unit on a concrete pad with an attached fuel tank. Service crews coordinate refuelling against the site's hour-meter log so the next visit never lands on an empty tank.

Standards & compliance

  • ISO 8528 (reciprocating engine generators)
  • SANS 10089 (fuel storage)
  • IEEE / NFPA 110 (emergency / standby power)
  • OHS Act 85 of 1993
  • Operator-specific genset MSWs

How we deliver

Where this fits in your operation.

Every Glenshade engagement runs the same five-step shape. The same crew that walked the site can hand the as-builts back to your NOC the next morning.

  1. Step 01

    Operator or TowerCo site

    Vodacom, ATC, Insite or MAST asset on the National Roaming footprint.

  2. Step 02

    RAMS + method statement

    Risk and method pack signed off before any boots reach the gate.

  3. Step 03

    Glenshade crew dispatched

    Branded fleet, trackered, marshalled from one of three regional bases.

  4. Step 04

    On-site work — Generator Services

    Generator Services happens at this stage — every other step exists to make this clean.

  5. Step 05

    Photographic as-built pack

    Geotagged before-and-after, signed checklist, e-mailed within the SLA window.

On site

What this looks like in the field.

Generator Services — site work
Generator Services — site work
Generator Services — site work
Generator Services — site work

Other services

The full delivery posture.

We're built so that the same crew that walked the tower can hand over to the same crew that does the civils — without a second site visit, a second method statement, or a second invoice cycle.

Next step

Tell us about the scope.

Send us the site list and the standard you work to. We'll come back with a RAMS pack and a quote.