Skip to main content
Glenshade Holdings
Client portal

CIV · Service line three · Structures & Ground

Civil Maintenance

The civil works that keep a site safe, accessible and compliant — foundations, fencing, drainage, vegetation control, access roads, equipment shelter integrity. The unglamorous work that protects everything above it.

What we do

The work, in detail.

  • Foundation repair, crack injection and waterproofing
  • Palisade fence rehabilitation (SANS 1390 compliant)
  • Razor-coil and electric-fence maintenance
  • Drainage clearing and surface-water management
  • Access-road grading and culvert maintenance
  • Vegetation control and bush clearing
  • Site signage replacement and ICASA compliance
  • Equipment shelter resealing and roof maintenance

Where this lives on a site

On the ground around the tower — foundations, perimeter fence, drainage paths, access roads, shelter integrity. Civil crews coordinate visits with passive maintenance to minimise total visit count.

Standards & compliance

  • SANS 1390 (palisade fencing)
  • SABS 1200 (civil works)
  • SANS 10400 (building regulations)
  • Construction Regulations 2014
  • ICASA site-marking signage

From the company profile

  • Foundations, plinths, fencing & access roads
  • Drainage, erosion control, vegetation management
  • Site support and maintenance readiness

Glenshade Business Profile, page 5

How we deliver

Where this fits in your operation.

Every Glenshade engagement runs the same five-step shape. The same crew that walked the site can hand the as-builts back to your NOC the next morning.

  1. Step 01

    Operator or TowerCo site

    Vodacom, ATC, Insite or MAST asset on the National Roaming footprint.

  2. Step 02

    RAMS + method statement

    Risk and method pack signed off before any boots reach the gate.

  3. Step 03

    Glenshade crew dispatched

    Branded fleet, trackered, marshalled from one of three regional bases.

  4. Step 04

    On-site work — Civil Maintenance

    Civil Maintenance happens at this stage — every other step exists to make this clean.

  5. Step 05

    Photographic as-built pack

    Geotagged before-and-after, signed checklist, e-mailed within the SLA window.

On site

What this looks like in the field.

Civil Maintenance — site work
Civil Maintenance — site work
Civil Maintenance — site work
Civil Maintenance — site work

Other services

The full delivery posture.

We're built so that the same crew that walked the tower can hand over to the same crew that does the civils — without a second site visit, a second method statement, or a second invoice cycle.

Next step

Tell us about the scope.

Send us the site list and the standard you work to. We'll come back with a RAMS pack and a quote.